The floor of the smoke box will be fabricated
in Muscle Shoals and bolted to the saddle. When the boiler is fitted up to
the frame, the smoke box floor will be welded to the boiler.
Saddle prior to drilling pilot holes.
Photo: Steam
Operations Corporation
Layout of smoke box saddle holes as highlighted by black circle
Photo: Steam
Operations Corporation
Terry Allen drilling pilot holes in smoke box
saddle.