October 16, 2008
The firebox area is complete. A few new stay bolts need to be installed, but all the hard tasks have been done. The dry pipe has been re-installed, attached to the super heater header, and hydro tested. The connections on the superheater header have all be cleaned up and are ready for mating to the super heaters (later). The tubes & flues will need to be installed next.
The bottom of the smoke box will be fabricated in Muscle Shoals and welded to the smoke box when the boiler & frame are mated up in Muscle Shoals some time in 2009.