The boiler is rolled out of the Historic Machinery shop and sits in the sun
for the first time in many years. |
Photo: Jason Lamb |
It began as a dark & stormy day. The 275 Ton crane
arrives and dwarfs the boiler! The crew rigs a spreader bar and slings
the boiler around its center of gravity. |
Photo: Jason Lamb |
A rare view of the boiler as it swings over to be positioned
on the trailer. |
Photo: Jason Lamb |
The boiler is secured to the trailer and is ready for transport. G&R
Services (Birmingham) provided the crane & trailer. |
Photo: Jason Lamb |
|
|
The Boiler arrives at Listerhill TMC. It's shown here on the truck
scale and the weight of the boiler is 73,000 pounds. |
Photo: Steam Operations Corporation |
The bolier is carefully backed into the maintenance building. |
Photo: Steam Operations Corporation |
Both a crane and a 70 Ton forklift are used to lift the boiler off the truck
and th truck is pilled out. |
Photo: Steam Operations Corporation |
Secure in it's temporary home, the boiler will be stored until it's time to
install it on the frame & cylinder saddle. |
Photo: Steam Operations Corporation |
|
|